Selwyn Street, Student Accommodation


Selwyn Street Student Accommodation | Tauranga
BCD Group completed the structural and civil engineering on this project. The project consisted of demolition of the existing building to redevelop the site and construct approximately 6,000m² of accommodation and ancillary amenity spaces spread over five levels, including basement car parking.
Disciplines involved:
-
During the design process both timber and structural steel options where reviewed, the final design is a hybrid of both structural steel bracing and a timber gravity structure which resulted in the client achieving a balanced sustainable design.
-
The civil team provided storm, waste and potable water supply solutions on the site which had 100% coverage. The solutions also catered for increased demands that would be put on the systems due to increased occupancy of the site.